2019 CIP Water Pipeline Replacement Project
City of Redlands, Redlands, CA

2019 CIP Water Pipeline Replacement Project, City of Redlands, Redlands, CA

Category

Water Resources Engineering

About This Project

Design and construction of approximately 52,000 linear feet (LF) of 8-inch potable water main and 3,000 LF of 12-inch potable water main in various parts of MUED’s services area, encompassing 45 different streets and five (5) different Pressure Zones. Said Pressure zones range in elevation from the 1570 Pressure zone (lower lying areas in the North) up to the 2340 Pressure zone (upper Redlands Heights area to the South). In total, Project is anticipated to include 55,000 LF of pipe; about 10.4 miles.